Mecapress.comAutomotive news in real time

Detected on Friday 13 November, 07h00

Electric Audi A4 Delayed to 2029 Due to SSP Platform Delays

Audi has pushed back the launch of its new electric A4 to 2029, as development of the Volkswagen Group's SSP platform accumulates delays.

In brief

Electric and batteries event (severity: notable) involving Audi and Volkswagen Group, in 2 countries (Allemagne, Italie), first detected on 13 November 2026 at 07:00. Reported by 6 sources (7 articles), last updated on 13 November 2026 at 16:30.

·
Severity
Notable
Countries

Several countries (2)

Ingolstadt
Brands
Detected
13 Nov, 07h00
Updated
13 Nov, 16h30
Reference
no.10032
01

Tone and style of coverage

Method

Tone and style of coverage

OutletAverage tone
autocar.co.uk2fairly negative
automoto.it1neutral
FormulaPassion1neutral
forococheselectricos.com1neutral
hdmotori.it1very positive
InsideEVs1fairly negative

Estimated by AI from headlines and extracts. Describes how the event is covered, not the outlet's stance.

02

Read sources · 7 articles, 6 sources

Publication order
  1. 07h00
    autocar.co.ukWirevia Autocar13 Nov
    Electric A4 delayed until 2029 amid VW Group setbacks

    New Scalable Systems Platform, due to underpin the new A4 EV, sees further delays Audi has delayed the introduction of the new electric A4 until 2029 as development of the Volkswagen Group's long-awaited Scalable Systems Platform (SSP) faces further setbacks. The new electric saloon, conceived as a direct rival to the electric-powered BMW i3 , Mercedes-Benz C-Class and Tesla Model 3 , was originally planned to enter production at Audi's Ingolstadt plant in Germany in 2028 as one of the first models based on the SSP architecture. However, Autocar understands that production of the A4 E-tron is

  2. 07h00
    autocar.co.ukWirevia Autocar13 Nov
    Electric Audi A4 delayed until 2029 amid VW Group setbacks

    New Scalable Systems Platform, due to underpin the new BMW i3 rival, sees further delays Audi has delayed the introduction of the new electric A4 until 2029 as development of the Volkswagen Group's long-awaited Scalable Systems Platform (SSP) faces further setbacks. The new electric saloon, conceived as a direct rival to the electric-powered BMW i3 , Mercedes-Benz C-Class and Tesla Model 3 , was originally planned to enter production at Audi's Ingolstadt plant in Germany in 2028 as one of the first models based on the SSP architecture. However, Autocar understands that production of the A4 E-t

  3. 11h45
    FormulaPassionWirevia Google Actualités · Italie · automobile13 Nov
    Audi A4 e-tron, la piattaforma SSP causa un ritardo | FP - Auto Elettriche - Auto - FormulaPassion

    Audi A4 e-tron, la piattaforma SSP causa un ritardo | FP - Auto Elettriche - Auto FormulaPassion

  4. 12h23
    forococheselectricos.comAnalysisvia Forococheseléctricos13 Nov
    El nuevo Audi A4 eléctrico se pospone a 2029, estos son los motivos

    Debido a los retrasos en el desarrollo de la nueva plataforma modular SSP del Grupo Volkswagen, Audi ha pospuesto el lanzamiento del A4 e-tron al año 2029. Audi ha pospuesto el lanzamiento del A4 e-tron, su rival para los BMW i3 y Mercedes-Benz Clase C EQ, al año 2029. Originalmente, estaba previsto que la producción de este modelo comenzara en Ingolstadt (Alemania) en 2028, siendo el encargado de estrenar la nueva plataforma modular SSP del Grupo Volkswagen, una arquitectura que en el futuro sustentará a la inmensa mayoría de coches eléctricos de la compañía. Han sido precisamente los retraso

  5. 13h52
    automoto.itWirevia Automoto.it13 Nov
    Audi A4 elettrica, slitta il debutto: arriverà soltanto nel 2029 per i ritardi della piattaforma Volkswagen

    La nuova Audi A4 e-tron dovrà attendere ancora. Il debutto produttivo della berlina elettrica è stato rinviato al 2029 a causa delle difficoltà nello sviluppo della piattaforma SSP. A complicare il progetto anche alcune modifiche tecniche richieste dalla Casa di Ingolstadt, tra cui l'adozione di un impianto elettrico a 48 Volt

  6. 16h05
    InsideEVsWire13 Nov
    Audi A4 EV Delayed Amid VW Group Financial Troubles: Report

    Audi’s rival to the new BMW i3 and Mercedes-Benz C-Class was initially supposed to go into production in 2028.

  7. 16h30
    hdmotori.itWirevia HDmotori13 Nov
    Nuova Audi A4, l’avanguardia elettrica che sfida le berline di fascia alta

    La Casa dei Quattro Anelli è intenzionata a sviluppare la prossima gen di A4 su un'architettura utilizzabile in diversi segmenti The post Nuova Audi A4, l’avanguardia elettrica che sfida le berline di fascia alta appeared first on HDmotori.it .

03

Further reading