# Allye MEV: charging at 300 kW without a 300 kW electrical grid

> The Allye MEV system slowly stores electricity to deliver it quickly to vehicles, enabling 300 kW charging without a suitable grid. First deliveries are expected in 2027.

**In brief**: Electric and batteries event (severity: info) involving Allye, first detected on 7 November 2026 at 07:00. Reported by 1 source (1 article), last updated on 7 November 2026 at 07:00.

- Category: Electric and batteries
- Severity: Info
- Countries: Not located
- Brands: Allye
- First detected: 7 November 2026 at 07:00
- Updated: 7 November 2026 at 07:00
- Web page: https://mecapress.com/events/6077-allye-mev-charging-at-300-kw-without-a-300-kw-electrical-grid

## Sources (1 articles)

- [Ricaricare a 300 kW senza una rete da 300 kW: ecco come](https://insideevs.it/news/814687/allye-mev-ricarica-fino-400/) — InsideEVs Italia, 7 November 2026 at 07:00

---

Cite as: Mecapress, “Allye MEV: charging at 300 kW without a 300 kW electrical grid”, https://mecapress.com/events/6077-allye-mev-charging-at-300-kw-without-a-300-kw-electrical-grid
Methodology: https://mecapress.com/methodology
