# TotalEnergies commissions its first megawatt charging station in France

> TotalEnergies has commissioned a 1 MW MCS charging installation at the AS 24 station in Phalsbourg, Moselle, which will also serve as a pilot site for electric heavy goods vehicles.

**In brief**: Electric and batteries event (severity: low) in Phalsbourg, Moselle (France), first detected on 3 November 2026 at 10:39. Reported by 2 sources (2 articles), last updated on 4 November 2026 at 13:10.

- Category: Electric and batteries
- Severity: Low
- Countries: Phalsbourg, Moselle — France
- First detected: 3 November 2026 at 10:39
- Updated: 4 November 2026 at 13:10
- Web page: https://mecapress.com/events/3117-totalenergies-commissions-its-first-megawatt-charging-station-in-france

## Sources (2 articles)

- [TotalEnergies met en service sa première borne de recharge MCS de 1 MW pour les poids lourds](https://www.auto-infos.fr/article/totalenergies-met-en-service-sa-premiere-borne-de-recharge-mcs-de-1-mw-pour-les-poids-lourds.294241) — Auto Infos, 3 November 2026 at 10:39
- [En Moselle, TotalEnergies inaugure son premier superchargeur de 1 000 kW pour camions électriques](https://www.bevolt.com/fr-fr/entreprises/actualites/camions-electriques/350644-en-moselle-totalenergies-inaugure-son-premier-superchargeur-de-1-000-kw-pour-camions-electriques/) — bevolt.com, 4 November 2026 at 13:10

---

Cite as: Mecapress, “TotalEnergies commissions its first megawatt charging station in France”, https://mecapress.com/events/3117-totalenergies-commissions-its-first-megawatt-charging-station-in-france
Methodology: https://mecapress.com/methodology
